August 2009

Plant Vogtle Units 3 and 4 received an ESP from the NRC. The Vogtle ESP is the first in the indusry to reference a specific technology and to come with a Limited Work Authorization (LWA) which allows limited safety-related construction at the site prior to receiving the COL.

2009-Aug1